Frelinghuysen Middle School Offices

In support of major renovations to the Frelinghuysen Middle School, due to enrollment slowly increasing, the Morris School District chose relocatable modular buildings to help solve their space needs. Changes began by moving the community school offices and child study team offices to new modular buildings that have been placed on the grounds of the middle school, making room for new and renovated classrooms and science labs within the existing school. The new modular building project consists of two relocatable modular buildings joined together by a structural steel decking system allowing the two new spaces to function as one. The combined areas, totaling 4,256 nsf, consist of eight offices, two conference rooms, reception and waiting areas, work rooms, storage rooms, and male and female restrooms with an adjoining deck. The space is conveniently located on campus as an auxiliary building to the existing school and has an upgraded school building look to match the campus.

This site transformed from a small parcel of grass at the corner of the ball fields to a fully functional office facility in less than 60 days. Electric, water, sewer, gas, and foundations were constructed while the building was manufactured in an offsite facility. The concurrent construction process provided the school with quick installations and minimal site disturbance, making it a fast and streamlined solution for the school. The design of this building was critical because the school needed to minimize losing space from the ball fields, while making the building accessible to the existing building. Two long rectangular buildings were designed and adjoined by a deck system to allow for these buildings to optimize the space and provide ideal functionality for the staff.

Energy efficiency was accomplished by constructing the building with (a) R-30 insulation in the floor, (b) R-21 insulation in the exterior walls, (c) R-11 in all interior walls, (d) R-38 insulation in the roof, and (e) an energy efficient rooftop package HVAC system with galvanized duct and programmable thermostats. Additionally, high-performance double insulated low E-clear windows with argon gas were installed to provide additional efficiency, especially with the cross winds from the open fields throughout the different seasons. To ensure further heating and cooling efficiency, all exterior doors were commercial steel insulated with aluminum insulated frames.

File Description View
PDF

MSD - Frelinghuysen Middle School Offices

[CHALLENGE]
A New Jersey middle school was renovating and creating new classroom space with an addition to their existing building. There was also available campus land to add free standing modular buildings. 

[SOLUTION]
Modular Genius installed 2 modular administrative buildings, approximatly 5,800 sqft including aluminum steps, ramps, and platforms. Multiple private offices, break rooms, and restrooms gave employees a comfortable working environment.

preview
image

MSD - Frelinghuysen Middle School Offices

  • Dimensions: 163' x 28'
  • Square Feet: 4,564
  • Details: 2 buildings with multiple offices, work ares, restrooms, reception & waiting rooms connected with aluminum ADA steps and ramps
  • Use: School Administration
  • Case Study
preview

Modular Genius is Proud Member of These Organizations: