Case Studies - Business - Locker Room, Break Room

The following Modular Locker Room, Break Room case studies highlight some modular building projects we are proud to present. Each project had a particular challenge Modular Genius was faced with. The challenge the customer presented was either speed, time or quality. Modular Genius solved each challege with a solution to meet the customers expectations.

Please contact us if you want to discuss your specific project further 888-420-1113.

View the case studies below by clicking on the PDF or thumbnail icon.

 

Case Study: Modular Locker Room / Break Room

File Description View
PDF

Deli - Modular Locker Room / Break Room

[CHALLENGE]
An Industrial Company was in need of upgrading the facilities for its workers. The building had to be durable, fit on a small part of the property and installed quickly.

[SOLUTION]
Modular Genius built a new 1,440 Sq Ft modular break room building for the client. The floors were installed with an epoxy resin to insure the surface could be cleaned regularly and would not wear out with traffic. Modular Genius provided a turnkey installation in 120 days from award to occupancy.

preview
PDF

Sibley - Doctors Sleeping Quarters Modular Building

[CHALLENGE]
Sibley Memorial Hospital was undergoing a major renovation which required the relocation of staff without interruption. The renovation involved the renewal of the surgeons locker room, offices and rest area. This area is required to be adjacent to the operating rooms on the third floor of the hospital.

[SOLUTION]
Modular Genius provided a 2,800 SF building that was placed on top of the third floor of the hospital. A steel superstructure was built on the roof to distribute the weight of the building. Once the building was craned and secured into place, site-built connecting links were constructed to allow access from the hospital to the new addition. All work took place while the hospital remained