Case Studies - Assembly

The following Modular Assembly Use Building case studies highlight some modular building projects we are proud to present. Each project had a particular challenge Modular Genius was faced with. The challenge the customer presented was either speed, time or quality. Modular Genius solved each challege with a solution to meet the customers expectations.

Please contact us if you want to discuss your specific project further 888-420-1113.

View the case studies below by clicking on the PDF or thumbnail icon.

Case Studies - Modular Assembly Worship Buildings

File Description View
PDF

Boca West - Spa & Fitness Center

[CHALLENGE]
A national general contractor was in need of an office complex on the jobsite for a large fast paced project. They needed to staff over 50 personnel during the multi-year project on site.

[SOLUTION] Modular Genius designed, built and installed 4,200 square-feet of modular buildings for the project.

preview
PDF

DCPL - Interim Modular Library

[Challenge]
During renovations and new construction of a library in Washington DC, the library district needed a temporary solution for the community to access all media and events.

[Solution]
Modular Genius provided a 6 unit, 4,260 sqft temporary modular library. The large open floor plan allows for rows of books as well as computer workstations throughout the building. People of all ages will have access to the library with ADA aluminum ramps during the 2 years of renovations.
 

preview
PDF

DSU - Weight Room and Fitness Center

[CHALLENGE] Delaware State University had to relocate their 5,000 square foot Fitness Center to make room for the construction of a new building. Relocation had to take place immediately following school commencement and be completed prior to school starting.

[SOLUTION] Modular Genius dismantled and moved the 5,000 square foot facility including free weights, treadmills, and other fitness equipment to an off-site storage facility. The modular building was dismantled and relocated across campus and then installed. All of the equipment was moved back into the facility. The project was a complete turnkey inclusive of utility connection.

preview
PDF

Hersey - Conference Center

[CHALLENGE]
A historic and prominent hotel was in need of additional modular swing space during a major construction project. There was limited room in the hotel during construction. A Modular Conference & fellowship hall had been decided the most expeditious way to add the space needed.

[SOLUTION]
Modular Genius built the 1,440 sq ft modular building. It was situated near the hotel and constructed with similar and accenting features of the hotel. The construction and installation of the modular building with powder coated aluminum steps and ramps was complete in 60 days from award to occupancy.

preview
PDF

Parsons - Visitors Center Modular Building

[CHALLENGE] A Large Lake was in need of environmental remediation. The contractor tasked to work on the cleanup needed a visitors center to education the public on the process.

[SOLUTION] Modular Genius and the contractor built, installed and finished the 960 sq ft modular visitors center building. Recycled building materials were used for the flooring. The exterior matched the geographic landscape.

preview
PDF

Riversdale - Visitors & Welcome Center

[CHALLENGE] Riversdale Historic Society was in need of a visitor's center for the Riversdale Mansion. The building had to be installed in a tight corner of the property and blend in with the surroundings.

[SOLUTION] Modular Genius assisted in the design of the modular building and provided project management, delivery, and installation services inclusive of permitting, utility connection and site work.

preview
PDF

TLCC - Conference & Fellowship Hall

[CHALLENGE]
A active church was growing and in need of a Conference & fellowship hall. They decide the most expeditious way to add the space needed was to build modular.

[SOLUTION] Modular Genius built the 3,600 sq ft modular building. The construction and installation of the modular building was completed in 120 days from award to occupancy.

preview

Modular Genius is Proud Member of These Organizations: