Case Studies - Business

The following Modular Business Office and Commercial Building case studies highlight some modular building projects we are proud to present. Each project had a particular challenge Modular Genius was faced with. The challenge the customer presented was either speed, time or quality. Modular Genius solved each challege with a solution to meet the customers expectations. 

Please contact us if you want to discuss your specific project further 888-420-1113.

View the case studies below by clicking on the PDF or thumbnail icon.

 

Case Studies: Modular Business / Commercial Buildings

File Description View
PDF

2-Story Modular Industrial Office

[CHALLENGE]
A North American bituminous material producer needed to expand their Baltimore Office to keep up with growing employee numbers and needs. An existing office building would be remodeled and receive the modular addition.

[SOLUTION]
Modular Genius constructed a 2-story modular addition, with approximately 2,770 sqft of space. This multi-function building contains restrooms, showers and lockers, an electric instrumental shop, 2 private offices, cubicles, and plenty of storage. An interior corridor connected the modular to the existing building, along with aluminum steps and ramps for access.

preview
PDF

Adelphi - Leasing Office & Fitness Center

[CHALLENGE]
A local apartment / condo development was in need of office space, a fitness center for their community, along with an accesible business center for their members. However, the new facility had to be very eye catching.

[SOLUTION]
Modular Genius, not only could deliver exactly what the customer was looking for, but exceeded all modular standards. A beautiful 1,248 square foot leasing and fitness center was built in 60 days from permit to completion.

preview
PDF

Andrews Field Office - Temporary Prefabricated Office Building

[CHALLENGE]
ATask Order Contractor working at an US Air force base was is need of Temporary Pre-Fabricated Office Building to house personal during their 5 year contract. They wanted to build a modular building using GREEN materials similar to those used in the military buildings they were tasked to renovate.

[SOLUTION]
Modular Genius built this customer a 2,160 square foot modular building using the following sustainable features: Recycled Content (Insulation and Floor Covering) Lighting (Natural Lighting Skylights, LED light fixtures with occupancy sensors) Plumbing (Double flush toilets and faucets with sensors) Energy (Low E windows, White reflective roof covering).

preview
PDF

BMC - Business Office

[CHALLENGE]
A local business in Cumberland, MD was in need of office space for their growing staff. The overall goal was to create this space as quickly and efficiently as possible, with minimal construction delays.

[SOLUTION]
Modular Genius assisted in the design and creation of a 3,600 square foot (60' x 60') modular facility, to accomodate this customers needs. This project was constructed, delivered, and installed in approximately 60 days from award.

preview
PDF

BC Northwest Collections - L Shaped Office

[CHALLENGE]
A local collections facility in Baltimore was in need of additional office space that could be located at their exisiting facility. However, the exisiting site did no leave a lot of space for a traditional square/boxed building.

SOLUTION]
Modular Genius assisted in the design of the moduar, creating it in a 'L' shape in order to fit the building in the given space. Modular Genius also provided project management, delivery and installation services.

preview
PDF

BGE Arlington - Training Office

[CHALLENGE]
A local Baltimore electric company needed a new training and education center. It needed to be resurrected as quickly as possible in order to train new employees as soon as possible.

[SOLUTION]
Modular Genius built a 24' x 36' (864 square feet) modular building for this Baltimore customer in 60 days. This building included the 'classroom', a tile finished restroom, and a finished ADA wood ramp.

preview
PDF

DC Housing - Temporary Modular Office Complex

[CHALLENGE]
A non-profit organization, created for the development of affordable housing in the DC area, was in need of a large modular office complex during a relocation project.

[SOLUTION]
Modular Genius provided a 13,680 sqft modular office consisting of 19 units. Many green products were used in the construction of the buildings, and at the end of the relocation the modular building will be recycled and reused to fill other needs. 

preview
PDF

DCW - 7 Unit Modular Field Office Complex

[CHALLENGE]
A large city undergoing major sewer and water infrastructure upgrades was in need of a modular field office complex during the construction.

[SOLUTION]
Modular Genius provided a 5,040 sq ft modular field office complex. This modular building had 60’ steel clear span construction so that no interior columns would interfere with the work area. The construction and installation of the modular building inclusive of electrical connection, sewer and water connection, phone / data connection plus site built steps, decks and ramps was complete in 75 days from award to occupancy.

preview
PDF

Deli - Modular Locker Room / Break Room

[CHALLENGE]
An Industrial Company was in need of upgrading the facilities for its workers. The building had to be durable, fit on a small part of the property and installed quickly.

[SOLUTION]
Modular Genius built a new 1,440 Sq Ft modular break room building for the client. The floors were installed with an epoxy resin to insure the surface could be cleaned regularly and would not wear out with traffic. Modular Genius provided a turnkey installation in 120 days from award to occupancy.

preview
PDF

DSU - Weight Room and Fitness Center

[CHALLENGE] Delaware State University had to relocate their 5,000 square foot Fitness Center to make room for the construction of a new building. Relocation had to take place immediately following school commencement and be completed prior to school starting.

[SOLUTION] Modular Genius dismantled and moved the 5,000 square foot facility including free weights, treadmills, and other fitness equipment to an off-site storage facility. The modular building was dismantled and relocated across campus and then installed. All of the equipment was moved back into the facility. The project was a complete turnkey inclusive of utility connection.

preview
PDF

DTCC - Modular Administration Building

[CHALLENGE]
A Delaware college needed to purchase a new swing space to house their administration staff. The building had to be economical but still provide the employees a safe and comfortable work experience.

[SOLUTION]
Modular Genius provided a 2,880 sqft modular administrative building which included aluminum steps, ramps, and canopy. The modular space had a large flexible open work space as well as offices, restrooms, and a break room. The project was completed in 30 days from notice to proceed. 

preview
PDF

ICC - Temporary Modular Police Station

[CHALLENGE]
The State Poloice, in Maryland, were in need of a temporary police station, while their main headquarters was being built over the next four to five years. This station needed to be utilized as a fully functional station.

[SOLUTION]
Modular Genius was up for the challenge. To prepare this station, a sturdy holding area with tight cell locks needed to be installed, as well as a roll call area, booking station, and reception space. This was all accomplished, and this station is a fully functional state police station for the state of Maryland.

preview
PDF

JHH - Contractors Field Office

[CHALLENGE]
A general contractor was is need of a field office on site for a large construction project at a local hospital in Balitmore, Maryland. They needed the office large enough for all their personnel as well as contained in an organized work flow in order to accomplish as much in a work day as possible.

[SOLUTION]
Modular Genius built this customer a 11,520 square foot building along with a 4,200 square foot building office complex. The two buildings were split accordingly to enhance the contractors work flow, and utilize all the space provided.

preview
PDF

Merck - Industrial Facility Modular Office

[CHALLENGE]
A industrial manufacturing facility was in need of additional office space to be located within their compound. A variety of spaces were needed inside the building including a breakroom and conference room.

[SOLUTION]
Modular Genius designed and built the modular office space using durable materials that could withstand the test of time in an industrial environment. The project was constructed delivered and installed in 120 days from contract to completion. 

preview
PDF

MES - Modular Environmental Office & Classroom

[CHALLENGE]
Located in the waters of the Chesapeake Bay, this dredged material refuge serves as a place of learning as well as an expanding home for local wildlife. A temporary building was needed as offices for workers and a classroom for visitors. Minimal site disturbance and environmental impact was key.

[SOLUTION]
Modular Genius provided a 4,884 sq ft temporary modular building that includes offices, an area for visitors and students, and even holding tanks for turtles that are sent to Maryland schools to raise and release. The prefabricated building will be easily relocated when the restoration project is complete.

preview
PDF

MES - Auxiliary Modular Office

[CHALLENGE]
A co-generation facility on Maryland’s Eastern Shore was in need of additional office space to keep pace with their growing environmental operations and services.

 [SOLUTION]
Modular Genius designed, supplied, and installed a 1,288 sq ft modular building. The structure included ADA restrooms and a kitchenette, along with wooden decks and ramps. The turnkey installation was completed in 120 days from award to occupancy.

preview
PDF

MES - State Park Office Space

[CHALLENGE]
An enviromental group located in Masonville, Maryland was in desperate need of new office space. They needed this building to be constructed using methods that were as enviromentally friendly as possible, so they went modular.

[SOLUTION]
Modular Genius designed and engineered a 2,160 square foot office building for this customer. Modular construction is known to be more enviromentally friendly due to the in house building and the cut back on construction waste during actual factory production. This was plenty to satisfy this customer!

preview
PDF

MES - Temporary Modular Laboratory

[CHALLENGE]
To assist the Patapsco Restoration Project, Maryland Environmental Service (MES) requested a temporary laboratory solution that could be moved quickly when the need arises.

[SOLUTION]
Modular Genius provided a 720 sqft modular laboratory building. This poratable building was installed without skirting, allow the building to be moved from its current location in one month without material waste or excessive cost. The project was complete within 60 days from notice to proceed. 

preview
PDF

MES - Modular Environmental Office & Classroom

[CHALLENGE]
Located in the waters of the Chesapeake Bay, this dredged material refuge serves as a place of learning as well as an expanding home for local wildlife. A temporary building was needed as offices for workers and a classroom for visitors. Minimal site disturbance and environmental impact was key.

[SOLUTION]
Modular Genius provided a 4,884 sq ft temporary modular building that includes offices, an area for visitors and students, and even holding tanks for turtles that are sent to Maryland schools to raise and release. The prefabricated building will be easily relocated when the restoration project is complete.

preview
PDF

MPC - Modular Sales & Dispatch Office

[CHALLENGE]
Growing at a rapid pace, a local family owned and operated concrete supplier required a large updated dispatch office to replace their original dilapidated trailer.

[SOLUTION]
A two story prefabricated sales & dispatch office was installed on site for a total of 2,880 sqft. Several offices, kitchen, and restrooms provide employees with a comfortable work environment. Aluminum steps and ramps were installed for access to the second floor. 

preview
PDF

MSD - Frelinghuysen Middle School Offices

[CHALLENGE]
A New Jersey middle school was renovating and creating new classroom space with an addition to their existing building. There was also available campus land to add free standing modular buildings. 

[SOLUTION]
Modular Genius installed 2 modular administrative buildings, approximatly 5,800 sqft including aluminum steps, ramps, and platforms. Multiple private offices, break rooms, and restrooms gave employees a comfortable working environment.

preview
PDF

NJI - Modular Office Building

[CHALLENGE]
A New Jersey manufacturer needed additional office space to house a quickly growing staff. They required an adjacent space that would blend in to their existing buildings.

[SOLUTION]
Modular Genius provided a new modular office building that was covered in similar hi-ribbed steel siding as their main plant. The interior design was configured to allow for a better managed work flow. This included a reception area for employees to access their documents, open work space, and private offices. The modular project was completed in less than 30 days. 

preview
PDF

Old Eastern - Modular Professional Office

[CHALLENGE]
A local professional office needed space fast for their growing business. They requested a permanent modular office building that had open work space as well as personal offices.

[SOLUTION]
Modular Genius provided a 1,012 sqft modular professional office that included 2 offices, a restroom, and an ADA wooden ramp. The project was completed in less than 60 days.

preview
PDF

Parsons - Field Office Modular Complex

[CHALLENGE]
Large Lake was in need of environmental remediation. The contractor tasked to work on the cleanup needed a very large modular project field office to house all of the engineers.

[SOLUTION]
Modular Genius built and installed the 10,000 sqft modular building. Pad mounted HVAC units and high end building materials made this home away from home a desirable work environment for the multi-year project. 

preview
PDF

Pepco - Temporary Modular Office

[CHALLENGE]
An Electric Service Provider was in need of temporary modular office space during the decomissioning of a large power plant. The mobile office needed to be installed and removed in a short amount of time.

[SOLUTION]
Modular Genius leased a 1,440 sq ft mobile office with a restroom and aluminum ramps for a duration of 7 months. 

preview
PDF

PEPCO - Modular Training Center

[CHALLENGE]
A power company had to relocate their existing power pole training offices and classrooms. They needed to move out and be up and operational in a short period of time for a seamless transition.

[SOLUTION]
Modular Genius installed a 2,880 sq ft modular training center for their new facility. The fabrication and installation was complete in 60 days from award, inclusive of prefabricated aluminum decks and ramps and accordion walls inside the training rooms.

preview
PDF

QA Drug Task Force - Modular Field Office

[CHALLENGE]
A County Police Drug Task force was in need of setting up a field office to act as headquarters in a troubled part of the county. A modular building was decided to be the fastest means of setting up operations.

[SOLUTION] Modular Genius provided a 1,440 sq ft modular field office complex. The construction and installation of the modular building inclusive site built steps, decks and ramps was complete in 60 days from award to occupancy.

preview
PDF

Reagan National Airport - Valet Parking Office

[CHALLENGE]
Reagan National Airport is constantly faced with over-crowded parking. The conversion of an existing lot into a valet parking lot was needed to help relieve the strain. Construction had to take place during the weekend so it did not interfere with the traffic during the regular work week.

[SOLUTION]
Modular Genius manufactured, delivered, and installed the 2,440 square foot modular office building in 30 days from time of contract. The building functions as an office for the staff and a waiting room for the customers as they wait for their cars to be retrieved from the valet.

preview
PDF

Renovated Modular Retail Building

[CHALLENGE]
A small business in Pennsylvania needed a seasonal retail building that met strict fire codes. The budget for the project was limited, but the owner was open to suggestions and various floor plans.

[SOLUTION]
Modular Genius provided a used 24’ x 60’ modular building that was refurbished and configured to retail specifications. Fire protection was critical, alarms and sprinklers were installed to code for safety. The project was completed on time and under budget, in less than 30 days.

preview
PDF

Richmond - Business Office

[CHALLENGE]
A local industrial manufacture needed permanent office space at their new location in Richmond Virginia. They needed to relocate their staff as soon as possible so that that they did not have to extend their current lease. Modular construction was an ideal type of construction that would produce a permanent appearance while reducing the timeline for site construction and the permit process.

[SOLUTION]
Modular Genius worked with the customer and the General Contractor to meet the client’s expectations. A crawl space foundation was constructed to place the modules as close to the ground as possible. Once the buildings were craned into place an EFIS exterior was applied to conceal themate-lines and

preview
PDF

Sandy Point - State Police Station

[CHALLENGE]
The Maryland State Police needed a local facility in Sandy Point State Park. It was very important that this building not look modular. The overall building needed to match the surrounding architecture. This building was also going to be located in a known marshy area, which would need to be taken into consideration when designing the foundation.

[SOLUTION]
Modular Genius accomplished the overall look and feel of the building by constructing a shingled mansard roof, and used a vinyl siding that matched the surrounding buildings. Regards to the marshy area, Modular Genius suggested and designed a perimeter wall foundation with a crawl space.

preview
PDF

Sandy Point - State Police Station 2

[CHALLENGE]
The State Police in Maryland in conjunction with Homeland Security needed a local facility in close proximity to a major highway. The esthetics was important to the customer for this project as this was going to be a permanent modular building.

[SOLUTION]
Modular Genius provided a 7,000 sq ft modular building inclusive of offices, administrative space, training rooms and restrooms. The project was completed in 150 days from award to occupancy.

preview
PDF

SEPTA - Modular Railroad Facilities

[CHALLENGE]
A railroad needed to replace a dilapidated office trailer with more space and restrooms for employees. The site was also precariously surrounded with railroad tracks.

[SOLUTION]
Modular Genius provided 2 modular buildings to the yard, totaling 1,472 sqft. A single wide modular building included an office, lockers, and break rooms – while a double wide held restrooms and a large open work area. The project was completed in 68 days. 

preview
PDF

Shale Oil Modular Office

[CHALLENGE]
A Shale Company was in need of an office building to accommodate its rapidly growing business. The newly acquired land was grubbed/cleared and utilities, roads etc. were brought in to service the companies’ operations and to provide jobs to the community.

[SOLUTION]
Modular Genius configured an existing modular building to accommodate the company’s work flow and assist with a positive work environment by creating a clean, well-appointed office building on their new land. A large wrap around deck, complete with an ADA handicap ramp was installed to provide employees a place to relax when not working.

preview
PDF

State of MD - Modular Access Control Center Building

[CHALLENGE]
A state government agency was in need of a permanent modular building to facilitate security clearance of a busy city seaport. They needed an area that allowed discretion and comfort, but incorporated state of the art technology.

[SOLUTION]
Modular Genius installed a 1,890 sq ft modular building for the customer. The modular space included a lobby and privacy booths as well as employee offices, data rooms, and a kitchenette.

preview
PDF

State Forestry Office - Modular Office Building

[CHALLENGE]
The Maryland Department of Natural Resources was in need of an office to house the Forestry Services for Somerset County. The office needed to be installed quickly to meet current budget constraints.

[SOLUTION]
Working with local contractors, Modular Genius built and installed a pre-fabricated modular building with a hinge roof on a foundation. The 1,200 square foot modular building project was complete in 120 days.

preview
PDF

St. E - Modular Field Office Trailer

[CHALLENGE]
A Design and Engineering contractor was working on a large multi-year federal government project and in need of office space during the construction.

[SOLUTION]
Modular Genius provided a 4,320sq ft modular field office complex. The construction and installation of the modular building inclusive of sewer and water plus site built steps, decks and ramps. It was complete in 75 days from award to occupancy.

preview
PDF

Town Point Park Visitor Center, Norfolk VA

[CHALLENGE]
The Town Point Park pavilion in downtown Norfolk Virginia underwent a $14M renovation in the summer of 2009. The events that take place at Town Point Park require facilities for the event staff, celebrity guest and caterers. The goal was to produce high end facilities, but because the park is located in a high wind/flood zone, permanent construction was prohibited.

[SOLUTION]
Modular Genius worked with the architects to create modern new look for the temporary buildings. Kalwall – High Performance Translucent Wall Panels were used for the exterior of each building creating a bright interior and a modern exterior appearance. Custom aluminum walkways were designed with wire mesh so that the contemporary structure.

preview
PDF

Wright Patterson - Contractors Modular Field Office

[CHALLENGE]
A Task Order Contractor working at an US Air Force Base needed a presentable field office for their staff. The office needed to fit on a small lot.

[SOLUTION]
Modular Genius built this customer a 4,320 square foot modular field office. The design was a 72’ X 60’ building with multiple offices, a conference rooms and kitchen. The last sections of the modular were lifted into place by crane to fit on the site. The project was completed in 60 days from award to occupancy.

preview