Case Studies - Government

The following Government and Military Modular Buildingcase studies highlight some modular building projects we are proud to present. Each project had a particular challenge Modular Genius was faced with. The challenge the customer presented was either speed, time or quality. Modular Genius solved each challege with a solution to meet the customers expectations.

Please contact us if you want to discuss your specific project further 888-420-1113.

View the case studies below by clicking on the PDF or thumbnail icon.

 

Case Studies - Modular Government Buildings

File Description View
PDF

BCR - Temporary Modular Bunk House

[CHALLENGE]
A County Government agency was in need of a temporary modular building for their fire department as a bunk house. They needed an the space to be attached to a fabricate structure that housed vehicles.

[SOLUTION]
Modular Genius installed a 2,160 sq ft modular building for the customer. The modular space was delivered and installed in approx. 120 days. 

preview
PDF

DCE1 - Temporary Fire House

[CHALLENGE]
Part of a multi-million dollar development throughout Washington DC, a temporary fire station was needed for up to 5 years. Minimal interference was necessary for traffic and surrounding businesses.

[SOLUTION]
Modular Genius provided a two-story 7,300 sqft temporary fire house with many work areas. A fire pole and equipment storage lockers were moved and reused from an existing station. A kitchen, bunks, fitness room, and locker room provide comforts, while the roll up doors allow room for 3 engines.

preview
PDF

DHS - Remote Field Office

[CHALLENGE]
The Department of Homeland Security had a requirement to install a field office at a remote location. The building required durable rubber flooring and secure rooms. 

[SOLUTION]
Modular Genius provided a 2,160 sqft modular field office facility. This modular building was installed with prefabricated aluminum steps and ramps. The project was completed in 90 days from notice to proceed.

preview
PDF

DOE - Pittsburgh - Administrative Office

[CHALLENGE]
The US Department of Energy had to add additional seats to a growing facility. The administrative modular space needed to be set up under strict time frame with a tight budget consideration.

[SOLUTION]
Modular Genius provided a lease for a (1) 7,200 sq ft modular facility. This modular building was installed with prefabricated aluminum steps and ramps. The project was completed in 120 days from notice to proceed.

preview
PDF

DOI - Government Field Office

[CHALLENGE]
The US Department of the Interior had a requirement to install a field office at a remote location in the desert. The building required durable exterior and interior to weather the harsh conditions.

[SOLUTION]
Modular Genius provided a 2,160 sqft modular field office facility. This modular building was installed with prefabricated aluminum steps and ramps. The project was completed in 90 days from notice to proceed. 

preview
PDF

HPK - Job Site Security Trailer

[CHALLENGE]
A Prime Contractor working for the US Army Corp of Engineers was instructed to provide a security trailer at the job site trailer compound.

[SOLUTION]
Modular Genius built this customer a 2,160 square foot security trailer. The design was a 36’ X 36’ building. The project was completed in 90 days from design to occupancy. 

preview
PDF

HPK - Modular Field Office Complex

[CHALLENGE]
A Prime Contractor working for the US Army Corp of Engineers was contracted to provide a modular field office complex for the engineering staff.

[SOLUTION]
Modular Genius built this customer a 14,400 square modular office building. The design was a 240’ X 60’ building with multiple offices, conference rooms, restrooms and administrative space. The project was completed in 90 days from design to occupancy. 

preview
PDF

Joint Task Force - National Capital Region Medical - Modular Fire House Sleeping Quarters

[CHALLENGE]
A local fire hall was updating their existing facilities on a US Government site which required a 3,136 Sq Ft sleeping quarters. The building had to be delivered and installed on a small corner not to disrupt the engine garage or traffic.

[SOLUTION]
Modular Genius constructed, delivered, and installed the facility in 120 days. The building had sleeping quarters, restrooms, showers, meeting area and kitchen. Work consisted of the building being installed on a foundation, with pre-fabricated aluminum stair towers.
 

preview
PDF

LC - Prefabricated District Judges Office

[CHALLENGE]
A local PA government had outgrown their previous courthouse. Needing more conference rooms, holding areas, and security the County chose to purchase a modular building for the task.

[SOLUTION]
Modular Genius provided a 3,500 sqft modular building that includes conference rooms for both the defense and the prosecution, detention benches, and ballistic glass for the clerks. A glass and masonry vestibule was added to the main entrance for access and aesthetics.

preview
PDF

NAVFAC - 2 Story Modular Office Building

[CHALLENGE]
The United States military required modular units for classrooms and administrative spaces (offices) for a naval surface warfare advanced training ground.

[SOLUTION]
Modular Genius provided 2 story modular building with a 10,434 sqft footprint. Multiple entrances with aluminum steps and ramps served for exterior accessibility, while an elevator allowed 2nd floor access from the inside. Once the project was under construction, it was completed in less than 60 days. 

preview
PDF

NPS - Assateague Island - Modular Ranger Station

[CHALLENGE]
The National Park Service was in need of a modular ranger station. However this modular office building was required to architecturally blend in with the natural seashore and wildlife refuge on this pristine barrier island. Additionally, a natural “inviting” appearance and a permanent installation was extremely important for this project.

[SOLUTION]
Modular Genius accomplished these aesthetic challenges by utilizing upgraded Virginia Slate asphalt shingles on the A-frame roof and a natural Cape Cod Gray horizontal vinyl siding with many architectural vinyl accents. Additionally, the building was set above grade on a permanent wood pile foundation and a pad mounted HVAC split-system was utilized. These attributes reinforced the natural “inviting” appearance and permanent application.

preview
PDF

NPS - Glacier Bay National Park Offices

[CHALLENGE]
A Government agency in Alaska was in need of modular offices at a remote location. Transport was not accessible by road and the buildings would need to be shipped in by barge.

[SOLUTION]
Modular Genius provided two 40’ x 10’ modular office buildings that were sent from Indiana, to Seattle to Juneau, and then to the final location. The units included laminate wood flooring, conference room with a kitchenette, and a restroom. The project was completed in about 60 days. 

preview
PDF

NPS - Liberty Island - Temporary Professional Facilities

[CHALLENGE]
The National Park Service needed to create a restroom/locker room, break area and maintenance office to support its renovation projects located on Liberty Island, NY. The project design was required to use low length units to be transported to the island via barge and then be offloaded by way of beach ramp.

[SOLUTION]
Modular Genius provided two modular structures, with the first being (6) 10’x24’ units and the second being (2) 10’x24’ units. Each unit was precisely sized to meet the barge and offloading shipping requirements. All the buildings were designed to function as both detached and interconnected modular units with shared walls; to give NPS the flexibility to relocate or reconfigure the buildings on site to meet different phases of their renovation project.

preview
PDF

NPS - Modular Weight Room / Exercise Building

[CHALLENGE]
A U.S. National Park was in need of a building to house free weights and exercise equipment. They decided that a modular building they could lease would give them the most flexibility with schedule and budget.

[SOLUTION]
Modular Genius constructed a modular building with increased floor loads to hold the weights and equipment. A 1,440 Sq Ft modular building was built delivered and installed on site in approx. 90 days from contract to completion.
 

preview
PDF

NPS - Office Renovation Modular Swing Space

[CHALLENGE]
A National Park Service was undergoing major renovations to their park. Modular office space a temporary restroom building and a prefabricated storage building was needed.

[SOLUTION]
Modular Genius constructed a 4,320 square foot worth of modular for the project. The size of the modular buildings were configured to fit the site condition. The project was complete in 120 days from award to occupancy
 

preview
PDF

NPS - President's Park Temporary Visitors Center

[CHALLENGE]
A government agency in Washington, DC was in need of a temporary modular building during the rehabilitation of a visitors center for a national landmark. An open space able to handle heavy traffic was necessary.

[SOLUTION]
Modular Genius provided a 1,400 sqft modular building for assembly use. An upgraded HVAC with humidity control was installed for maximum comfort and efficiency. Wooden ADA steps and ramps were used for function and a warm aesthetic appearance.

preview
PDF

UDVA Decatur - Modular Medical Eye Clinic - GA

[CHALLENGE]
The US Department of Veterans Affairs hospital in Georgia was in need of additional space to expand their eye clinic. There was no more room inside the hospital for the expansion. Modular Construction had been decided as the most expeditious way to expand the clinic.

[SOLUTION]
A Service disabled veteran contractor partnered with Modular Genius and built the 2,880 sq ft modular addition. It was attached to the existing hospital. The modular building was constructed with non-combustible materials. The hospital walls were cut out for expansion so one could walk from the existing hospital into the modular addition on the same floor without obstruction.

preview
PDF

US Army - Cafeteria

[CHALLENGE]
The US Army was updating facilities on an isolated island which required a 2,160 square foot cafeteria/command center for troops training. The building had to be delivered and installed at the remote location in between exercises so as not to disrupt training.

[SOLUTION]
Modular Genius constructed, delivered, and installed the 2,160 square foot facility in 45 days. Work consisted of the building being installed on a foundation, with site built entrance stairs. The project was delivered on time and within budget.

preview
PDF

US Army Corps of Engineers APG

[CHALLENGE]
The U.S. Army Corps of Engineers was scheduled to build a chemical defense complex at Aberdeen Proving Ground for the U.S. Army Medical Research Institute of Chemical Defense, USAMRICD, a government agency charged with protecting the military from chemical and biological attacks. The project needed temporary modular space during construction.

[SOLUTION]
Modular Genius was selected by the Prime site development Contractor of this project to provide 10,000 sq ft of furnished modular office space. Modular Genius designed the space to fit the requirements. The foundation,modular installation and furniture was fabricated and installed within 90 days.

preview
PDF

US Army Kimbrough - Ambulatory Care Medical Swing Space

[CHALLENGE]
The United States Army was in need of renovating the Hospital located at one of their facilities at FT Meade, MD. Their plans were to relocate part of the facility to a temporary space as the hospital underwent renovations.

[SOLUTION]
Modular Genius built this customer a 10,000 sq ft building. The temporary swing space was a fully functional medical facility with administrative space. The installation was complete in 90 days from award to occupancy.

preview
PDF

US Army - Earle - Modular Training Center

[CHALLENGE]
A Task Order Contractor working at an US Army Base needed to construct a modular training center for their customer.

[SOLUTION]
Modular Genius built this customer a 980 square foot modular training center. The design was a 14’ X 70’ building. The project was completed in 60 days from award to occupancy.

preview
PDF

US Army - HME Laboratory Trailer

[Challenge]
The United States Military required space that would be used for the study and training associated with Home Made Explosives (HME). Occupancy of the building within 60 days was mandatory. Certain interior items needed to be explosion proof or non-acid reactive to maintain a safe working environment.

[Solution]
Modular Genius provided a 640 sqft Modular Laboratory Trailer in the short time frame that was required. A specialized fume hood, emergency shower, eyewash station, and cipher locks were installed for the safety and security of the building owners. Extensive cabinetry and surfaces provided ample work space for testing and training.
 

preview
PDF

US Army APG - Mobile Office

[CHALLENGE]
The US Department of the Army was in need of replacing old Mobile Offices. A nice appearance to blend with the current base environment along with up to date building codes for the new mobile buildings was the requirement.

[SOLUTION]
Modular Genius provided a (1) 576 sq ft modular classroom, and (2) 400 sq ft mobile offices. These mobile offices were installed with prefabricated aluminum steps, ramps and canopies. The project was completed in 60 days from notice to proceed.

preview
PDF

US Army Kimbrough - Modular Pathology Lab Building

[CHALLENGE]
The United States Army was in need of renovating the Hospital located at one of their facilities at Ft. Meade, MD. Their plans were to relocate part of the facility to a temporary space as the hospital underwent renovations. 

[SOLUTION]
Modular Genius built this customer a 3,600 sq ft Modular Pathology Lab Building. The temporary swing space was a fully functional medical facility with administrative space. The installation was complete in 90 days from award to occupancy.

preview
PDF

US Army Kimbrough - Modular Pathology Lab Building

[CHALLENGE]
The United States Army was in need of renovating the Hospital located at one of their facilities at Ft. Meade, MD. Their plans were to relocate part of the facility to a temporary space as the hospital underwent renovations. 

[SOLUTION]
Modular Genius built this customer a 3,600 sq ft Modular Pathology Lab Building. The temporary swing space was a fully functional medical facility with administrative space. The installation was complete in 90 days from award to occupancy.

preview
PDF

US Air Force - Andrews - Mobile Trailer - Security Building

[CHALLENGE]
Modular Genius was called by a Task Order Contractor working at an US Air Force Base to design a mobile trailer that would have two separate entrances under one roof. The contractor had two clients that needed space fast on base.

[SOLUTION]
Modular Genius built this customer a 3,648 square foot mobile trailer. The design was a 48’ X 76’ building with a wall down the center. Each of the main entrances shared a single door with lead to a vestibule with shared restrooms. Each client would then be able to enter their work space and be separate from the other.

preview
PDF

US Air force - Dover - Administrative Modular Space

[CHALLENGE]
A US Air Force Base had to add additional seats to a growing facility. The administrative modular space needed to be set up under strict time frame a fit the look of the facility.

[SOLUTION]
Modular Genius provided a 3,600 office modular facility. This modular building was installed with site built ramps and steps. The project was completed in 90 days from notice to proceed.
 

preview
PDF

US Air Force - Temporary Prefabricated Office Building

[CHALLENGE]
A Task Order Contractor working at an US Air force base was is need of Temporary Pre-Fabricated Office Building to house personal during their 5 year contract. They wanted to build a modular building using GREEN materials similar to those used in the military buildings they were tasked to renovate.

[SOLUTION]
Temporary Prefabricated Office Building Modular Genius built this customer a 2,160 square foot modular building using the following sustainable features: Recycled Content (Insulation and Floor Covering) Lighting (Natural Lighting Skylights, LED light fixtures with occupancy sensors) Plumbing (Double flush toilets and faucets with sensors) Energy (Low E windows, White reflective roof covering).

preview
PDF

US Air National Guard - WV - Modular Office Space

[CHALLENGE]
An Air National Guard facility was in need of additional office and meeting space. The new modular office space needed to look similar to surrounding buildings of the rural facility.

[SOLUTION]
Modular Genius provided a 1,440 office modular space to meeting the scope of work. This modular office space was installed with site built ramps and steps. The project was completed in 90 days from notice to proceed.

preview
PDF

US Coast Guard DHS Headquarters - Modular Field Office

[CHALLENGE]
A Task Order Contractor working at the new US Coast Guard DHS headquarters in Washington, DC needed to construct two modular administrative buildings for their customer.

[SOLUTION]
Modular Genius built this customer (2) 2,160 sqft modular administrative buildings inclusive of work stations. The project was completed in 90 days from award to occupancy.

preview
PDF

US Coast Guard - Modular Administrative Space

[CHALLENGE]
The US Coast Guard had to add additional seats to a quickly growing facility. The administrative modular space needed to be set up under strict time frame with a tight budget consideration.

[SOLUTION]
Modular Genius provided a 3,600 sqft modular facility. This modular building was installed with prefabricated aluminum steps and ramps. The entire project was completed in 120 days from notice to proceed. 

preview
PDF

US Coast Guard - Modular Bunk House

[CHALLENGE]
A US Coast Guard Base had a temporary requirement for a bunk house during a renovation. The sleeping quarters modular space needed to be set up under strict time frame a fit the look of the facility.

[SOLUTION]
Modular Genius provided a 1,680 office modular bunk house. This modular building was installed with pre-fabricated steps. The modular was in stock and the project was completed in 30 days from notice to proceed.

preview
PDF

US Coast Guard Headquarters, DC

[CHALLENGE]
Creating the largest construction job since the Pentagon in 1940 the Federal Government is renovating and expanding upon former St. Elizabeth’s Hospital. This 4.5 million sq ft campus will house the Headquarters for the US Department of Homeland Security, US Coast Guard and 22 other agencies. During the construction of this mini city workers needed to be housed in modular buildings.

[SOLUTION]
Modular Genius was selected by the Prime Contractor and the Construction Manager of this project to provide over 23,000 sq ft of modular office buildings. What was so unique about the accomplishment is that was completed on time, on budget and occurred during the blizzard of 2009-2010 with a record snow

preview
PDF

USDA Insect - Office Space

[CHALLENGE]
The USDA was in need of an office to house additional administrative personnelat a lab. The office needed to be installed quickly to meet current budget constraints and the method of procurement was decided to be off the GSA schedule.

[SOLUTION]
Modular Genius provided a 1,440 square foot modular building in 120 days. The project consisted of utility connections, sidewalks, ramps, and parking.

preview
PDF

USDVA - Charlotte Hall - Offices - GSA - Office Building

[CHALLENGE]
The US Department of Veteran Affairs was in need of an administrative office at one of their facilities. The office needed to be installed quicly in order to meet current budget constraints, and the method of procurement was decided to be off the GSA schedule.

[SOLUTION]
Modular Genius provided a 1,440 square foot modular building in 90 days. The project consisted of utility connections, sidewalks, and ramps.

preview
PDF

USDVA - Safety Office

[CHALLENGE]
The US Department of Veteran Affairs was in need of a safety office for one of the facilities. The office needed to be installed on top of a steel superstructure because of underground site obstructions.

[SOLUTION]
Working with a Service Disabled Veteran Owned Small Business Modular Genius provided a 2,880 square foot modular building in 120 days. The project consisted of gas HVAC units, a hydraulic Modular Wheel Chair lift and prefabricated aluminum steps and canopies.

preview
PDF

US Marine Corps Base - NCIS, Quantico, VA

[CHALLENGE]
The Marine Corps Base in Quantico, VA was in need of office space for Naval Criminal Investigation Service (NCIS.) NCIS investigative efforts in support of the FBI’s investigation centered on protecting Marine Corps personnel assigned to MCB Quantico.These efforts are closely coordinated and supported by MCB Quantico Command to ensure the safety of military and civilian personnel aboard the base.

[SOLUTION]
Modular Genius provided 2,880 sq ft of modular office buildings. The buildings were installed on a secluded part of the Marine Corps base. The project was constructed, delivered and installed in approximately 60 days from award.

preview
PDF

US Marines - Officer Candidate School - Modular Swing Space

[CHALLENGE]
The United States Marine's were about to start a major transition pertaining to their Officer Candidate School. Their plans were to rebuild a larger, permanent building, but in the mean time they needed some additional office space and classrooms.

[SOLUTION]
Modular Genius built this customer a 60' x 60', 4,800 square feet, building. This building included additional office space along with the needed classrooms for the officer candidates. Modular Genius also completed all the steps, decks, and ramps that were required for this job as well.

preview
PDF

US Marines Comm School - Modular Building

[CHALLENGE]
The Marine Corps Base in Quantico, VA was in need of classroom space for the Training and Education Command (TECOM.) The mission of TECOM is to develop, coordinate, resource, execute and evaluate training and education concepts, policies, plans and programs to ensure Marines are prepared to meet the challenges of present and future operational environments.

[SOLUTION]
Modular Genius provided a 4,320 sq ft modular classroom building. The buildings were installed on the Marine Corps base in Quantico, VA. The project was constructed, delivered and installed in approximately 60 days from award.

preview
PDF

US Marines OCS - Convenience Store & Barber Shop

[CHALLENGE]
The United States Marine's were about to start a major transition pertaining to their Officer Candidate School. Their plans were to rebuild a larger, permanent building, but in the mean time they needed a place for the convenience store, and barber shop.

[SOLUTION]
Modular Genius built this customer a 24' x 60', 1,400 square feet, building. When one walks into the building they can go right to the convenience store, or left to get their 'shape-up' at the barber shop.

preview
PDF

US Marines - LSSS Modular Office

[CHALLENGE]
After reorganization of legal services, a Marine Corps base created a new support section but lacked adequate space to function under one facility.

[SOLUTION]
Modular Genius provided 8,580 sqft of new modular office space that brought together the scattered operations. With an occupancy of 85 people, the building contains many different work areas and facilities to provide legal support for individual Marines, sailors, family members, retirees and other installations.

preview
PDF

US Marines MCCLL - Modular Training Center

[CHALLENGE]
The Marine Corps Base in Quantico, VA was in need of office / training space for Marine Corps Center for Lessons Learned (MCCLL) . The mission of the MCCLL is to support the Commandant of the Marine Corps execution of his Title 10 (Organize, Train, Equip, and Provide) responsibilities by conducting assessments of forward area operations and exercises in order to identify emergingTitle 10 issues, collecting and managing the Marine Corps Lessons and TTP databases, and reporting findings, trends and issues through verbal, written and electronic media.

[SOLUTION]
Modular Genius provided a 3,600 sq ft of modular office / training building. The buildings were installed on the Marine Corps base in Quantico, VA. The project was constructed, delivered and installed in approximately 60 days from award.

preview
PDF

US Marines - SECTEC - Modular Office Building

[CHALLENGE]
The US Marine Corp was in need of additional administrative space for the Security Cooperation Education and Training Center (SCETC). Their mission is to coordinates, manages, implements, and evaluates security cooperation and civil affairs education and training. The space needed to be delivered quickly.

[SOLUTION]
Working with an 8a contractor Modular Genius provided a 4,920 sq ft modular training facility. The project was completed in 60 days from notice to proceed.

preview
PDF

US Marines - BUMED Medical Modular Building

[CHALLENGE]
The US Marine Corp Bureau of Medicine and Surgery (BUMED) was in need of additional administrative and storage space for vaccines. The vaccines had to be kept at a particular temperature to maintain stability of the medicine.

[SOLUTION]
Working with an 8a contractor Modular Genius provided a 3,600 sq ft modular building along with prefabricated ramps and ADA prefabricated aluminum steps. The project was completed in 60 days from notice to proceed.

preview
PDF

US Marines - Modular Swing Space

[CHALLENGE]
A Task Order Contractor working at an US Navy Base was renovating a small building and needed to displace some people from a building.

[SOLUTION]
They contacted Modular Genius to provide a 1,440 sq ft modular to be used as swing space for the project. The design was a 24’ X 60’ in stock building which delivered and installed in 14 days from award to occupancy.

preview
PDF

US Marines - Motor Transportation - Temporary Office Trailer

[CHALLENGE]
The US Marine Corp Motor Transportation Pool was in need of additional administrative space to administer to the fueling needs of vehicles on base.

[SOLUTION]
Working with an 8a contractor Modular Genius provided a 1,440 sq ft modular building. The project was completed in 60 days from notice to proceed.

preview
PDF

US Naval Academy, Maryland

[CHALLENGE]
The US Naval Academy was renovating Nimitz Library and in need of temporary office space during the renovation.The site selected was near the water on the edge of the historic campus.The project was under a tight time constraints and needed to be completed with limited disturbance to the Academy. Modular Office Buildings.

[SOLUTION]
US Naval Academy, Maryland Modular Genius was selected by the Prime Contractor of this project to provide over 15,000 sq ft of modular office buildings. Modular Genius leased the temporary buildings and furniture as well as connected the phone, data, fire alarms and electric.The location did not have sewer or water therefore Modular Genius brought in temporary water reservoirs and holding tanks for sewage.

preview
PDF

US Navy Pax River - Modular Support Center

[CHALLENGE]
One of the United States military forces was in need of office space, and space to support training missions. This space needed to allow for open communication with some space for private conversations and meetings.

[SOLUTIONS] Modular Genius built an 8,064 square foot office building that consisted of a large open space for individual working stations, restrooms, and a kitchen or break room. The desks and all workstations were built and put together on site by Modular Genius.

preview
PDF

US Navy - Dalhgren - Administrative Swing Space / MILCON

[CHALLENGE]
A Task Order Contractor working at an US Navy Base needed administrative space to house personal while their permanent MILCON building project was being constructed.

[SOLUTION]
Modular Genius provided (2) NEW 4,320 sq ft clear span modular buildings for the client. The buildings were shells and built our to fit the customer’s specific interior floor plan. The project was completed in 90 days from award to occupancy.

preview
PDF

US Navy - Dalhgren - Modular Daycare Building

[CHALLENGE]
Modular Genius was called by a Task Order Contractor working at a US Navy Base to design a modular daycare facility. The new building would have to fulfill all US Government guidelines for daycare.

[SOLUTION]
Modular Genius designed and built the US Government a 4,320 square foot modular daycare facility. The design was a 72’ X 60’ building with all the required rooms for children ages under 1 year to 5 years. The project was complete within 180 days from design to occupancy. 

preview
PDF

US National Guard - Administrative Modular Space

[CHALLENGE]
The US National Guard had to add additional seats to a growing facility. The administrative modular space needed to be set up under strict time frame with a tight budget consideration.

[SOLUTION]
Modular Genius provided a 4,320 modular facility. This modular building was installed with prefabricated aluminum steps and ramps. The project was completed in 120 days from notice to proceed.

preview
PDF

US Navy Oceana - Dental Transitional Modular Swing Space

[CHALLENGE]
The United States Navy was in need of renovating the Hospital located at one of their facilities in Oceana, VA. Their plans were to relocate part of the facility to a temporary space as the hospital underwent renovations.


[SOLUTION]
Modular Genius built this customer a 10,000 sq ft building. The temporary swing space was a fully functional dental medical facility with administrative space. The installation was complete in 90 days from award to occupancy.

preview
PDF

USSS - Modular Field Office

[CHALLENGE]
The US Secret Service had a requirement to install a field office at testing range. The building required a high load bearing floor for equipment.

[SOLUTION]
Modular Genius provided a 1,440 sqft modular field office facility. This modular building was installed with prefabricated aluminum steps and ramps. The project was completed in 60 days from notice to proceed. 

preview
PDF

VA DPW - Modular Office Space

[CHALLENGE]
A city government agency was in need of a permanent modular building for their public works department. They needed an new office space in a short period of time.

[SOLUTION]
Modular Genius installed a 2,160 sq ft modular building for the customer. The modular space included several employee offices, a data room, conference room and kitchenette. 

preview
PDF

VAMC - Prefabricated Mental Health Clinic

[CHALLENGE]
A government facility needed to expand an existing modular medical complex. A small vacant corner of the property was perfect to fit in a new modular building.

[SOLUTION]
Modular Genius provided an additional 60’ x 82’ modular building to match the existing complex on the property. The modular building houses over 15 offices, restrooms, break rooms, conference rooms and storage. The project was completed in the required 120 days.

preview
PDF

Modular Swing Space

[CHALLENGE]
A government agency in the process of a major building replacement needed to move its employees to an interim facility.

[SOLUTION]
Modular Genius provided a 9,000 sqft, LEED Silver, slab on grade, permanent modular building. Large open work spaces, along with mutiple offices, conference and break rooms, allow the agency to efficently continue their work. The exterior conforms with the styles of surrounding buildings and will continue to be used after the main construction project is completed.

preview