Case Studies - Healthcare

The following Modular Medical and Healthcare building case studies highlight some modular building projects we are proud to present. Each project had a particular challenge Modular Genius was faced with. The challenge the customer presented was either speed, time or quality. Modular Genius solved each challege with a solution to meet the customers expectations.

Please contact us if you want to discuss your specific project further 888-420-1113.

View the case studies below by clicking on the PDF or thumbnail icon.

 

Case Studies: Modular Medical / Healthcare Buildings

File Description View
PDF

George Washington - Temporary Prefabricated Medical Building

[CHALLENGE]
A Hospital was planning major renovations. They were needed to keep the operation running during the process and planned to move some exam rooms and office space out into a modular building.

[SOLUTION]
Modular Genius worked with a medical design professional and built the temporary modular healthcare facility that met their specific needs. A 1,440 Sq Ft modular building was built delivered and installed on site in approx. 60 days from contract to completion.

preview
PDF

Hualapai Mountain - Modular Medical Center

[CHALLENGE]
A Regional Hospital needed to expand their services. They were required to move these specialty doctors and staff outside of the main hospital to an adjacent site on the campus.

[SOLUTION]
Modular Genius worked with the Hospital to design and build the modular healthcare facility that met their specific needs and fit within the budget. A 2,880 Sq Ft modular building was built delivered and installed on site in approx 60 days from contract to completion.

preview
PDF

LSU - Temporary Interprofessional Clinic

[CHALLENGE]
LSU Health Sciences Center in New Orleans required an Interprofessional Clinic for the School of Dentistry and Nursing to provide primary and urgent care in a teaching environment to support the local community. 

[SOLUTION]
Temporary Interprofessional Clinic Modular Genius provided a 3,600 sqft temporary clinic. Off-site construction included installation of features inside the modular building such as laminate counter tops, exam room sinks, counters, cabinets, plumbing, electric for dental chairs, and interior finishes such as floor covering and drop ceilings.

preview
PDF

Manufacturers Modular Clinic

[CHALLENGE]
A group of manufacturers in Michigan opened two clinics on site to give employees appropriate care and advice to better manage their own health and that of their family.

[SOLUTION]
Modular Genius installed an 840 sqft modular clinic to provide employees with free, convenient access to a wide range of medical services. Two exam rooms, restroom, waiting room, and physician’s office are located in the building that was constructed in about 60 days. 

preview
PDF

MEDC - Clinical Trials Unit

[CHALLENGE]
A MI Innovative and economic business development organization partnered with a highly prominent research institute and needed a state of the art medical research building that would adjoin to their existing main office building.

[SOLUTION]
Modular Genius provided a 9,400 sqft single story Modular building addition that incorporates a brick/EIFS exterior and was installed on site to match the existing 56,000 Sq. Ft. building. This Modular addition was separated from the existing building with a concrete block fire wall and includes 13 beds, three infusion chairs, an investigational pharmacy, a lab and overnight room for volunteers.

preview
PDF

UDVA Decatur - Modular Medical Eye Clinic - GA

[CHALLENGE]
The US Department of Veterans Affairs hospital in Georgia was in need of additional space to expand their eye clinic. There was no more room inside the hospital for the expansion. Modular Construction had been decided as the most expeditious way to expand the clinic.

[SOLUTION]
A Service disabled veteran contractor partnered with Modular Genius and built the 2,880 sq ft modular addition. It was attached to the existing hospital. The modular building was constructed with non-combustible materials. The hospital walls were cut out for expansion so one could walk from the existing hospital into the modular addition on the same floor without obstruction.

preview
PDF

US Army Kimbrough - Ambulatory Care Medical Swing Space

[CHALLENGE]
The United States Army was in need of renovating the Hospital located at one of their facilities at FT Meade, MD. Their plans were to relocate part of the facility to a temporary space as the hospital underwent renovations.

[SOLUTION]
Modular Genius built this customer a 10,000 sq ft building. The temporary swing space was a fully functional medical facility with administrative space. The installation was complete in 90 days from award to occupancy.

preview
PDF

US Army Kimbrough - Modular Pathology Lab Building

[CHALLENGE]
The United States Army was in need of renovating the Hospital located at one of their facilities at Ft. Meade, MD. Their plans were to relocate part of the facility to a temporary space as the hospital underwent renovations. 

[SOLUTION]
Modular Genius built this customer a 3,600 sq ft Modular Pathology Lab Building. The temporary swing space was a fully functional medical facility with administrative space. The installation was complete in 90 days from award to occupancy.

preview
PDF

US Navy Oceana - Dental Transitional Modular Swing Space

[CHALLENGE]
The United States Navy was in need of renovating the Hospital located at one of their facilities in Oceana, VA. Their plans were to relocate part of the facility to a temporary space as the hospital underwent renovations.


[SOLUTION]
Modular Genius built this customer a 10,000 sq ft building. The temporary swing space was a fully functional dental medical facility with administrative space. The installation was complete in 90 days from award to occupancy.

preview
PDF

VAMC DC - 2 Story Modular Addition

[CHALLENGE]
A DC Veterans Hospital needed to expand its administrative space, but in order to maximize campus real estate, the 2 story modular had to be tucked into tight quarters between the existing buildings.

[SOLUTION]
Modular Genius provided 23,740 gross square feet of administrative office space, including private offices, group work stations, conference space, work flow circulation, break rooms, toilets, janitorial facilities and all adjunct facilities. 

preview
PDF

Wayne Co - Family Medical Clinic

[CHALLENGE]
A County Hospital had interest to expand their services to small rural community in need of local healthcare. The Hospital had the land, doctors and staff and needed a fast modular building solution.

[SOLUTION]
Modular Genius worked with the Hospital to design and build the modular healthcare facility that met their specific needs and fit within the budget. A 2,100 Sq Ft modular building was built delivered and installed on site inclusive of all turnkey services in approx 90 days from contract to completion.

preview
PDF

Wellness Center Modular Clinic

[CHALLENGE]
A School District was need of a wellness center for the school. There was a shortage of space inside the school causing a need for a standalone modular building.

[SOLUTION]
Modular Genius worked built the modular healthcare facility that met their specific needs. A 1,440 Sq Ft modular building was built delivered and installed on site in approx. 60 days from contract to completion.

preview
PDF

West Cecil - Community Healthcare Facility

[CHALLENGE]
A small rural community was in need of local healthcare and applied for a Federal Grant to support their vision of bringing healthcare close to home. The dream came true when the grant was approved. The facility had to be up and operational in a matter of months to comply with the Federal Grant.

[SOLUTION]
Modular Genius worked with the community to design and build the heathcare facility that met their specific needs and fit within the budget of the grant. A 2,772 Sq Ft modular building was built delivered and installed on site in approx 60 days from time of contract.