Case Studies - Sustainable Modular Green Building

The following Sustainable Modular Green Building case studies highlight some modular building projects we are proud to present. Each project had a particular challenge Modular Genius was faced with. The challenge the customer presented was either speed, time or quality. Modular Genius solved each challege with a solution to meet the customers expectations.

Please contact us if you want to discuss your specific project further 888-420-1113.

View the case studies below by clicking on the PDF or thumbnail icon.

 

 

Case Study: Sustainable Modular Green Building

File Description View
PDF

Town Point Park Visitor Center, Norfolk VA

[CHALLENGE]
The Town Point Park pavilion in downtown Norfolk Virginia underwent a $14M renovation in the summer of 2009. The events that take place at Town Point Park require facilities for the event staff, celebrity guest and caterers. The goal was to produce high end facilities, but because the park is located in a high wind/flood zone, permanent construction was prohibited.

[SOLUTION]
Modular Genius worked with the architects to create modern new look for the temporary buildings. Kalwall – High Performance Translucent Wall Panels were used for the exterior of each building creating a bright interior and a modern exterior appearance. Custom aluminum walkways were designed with wire mesh so that the contemporary structure.

preview
PDF

Parsons - Visitors Center Modular Building

[CHALLENGE] A Large Lake was in need of environmental remediation. The contractor tasked to work on the cleanup needed a visitors center to education the public on the process.

[SOLUTION] Modular Genius and the contractor built, installed and finished the 960 sq ft modular visitors center building. Recycled building materials were used for the flooring. The exterior matched the geographic landscape.

preview
PDF

Andrews Field Office - Temporary Prefabricated Office Building

[CHALLENGE]
ATask Order Contractor working at an US Air force base was is need of Temporary Pre-Fabricated Office Building to house personal during their 5 year contract. They wanted to build a modular building using GREEN materials similar to those used in the military buildings they were tasked to renovate.

[SOLUTION]
Modular Genius built this customer a 2,160 square foot modular building using the following sustainable features: Recycled Content (Insulation and Floor Covering) Lighting (Natural Lighting Skylights, LED light fixtures with occupancy sensors) Plumbing (Double flush toilets and faucets with sensors) Energy (Low E windows, White reflective roof covering).

preview

Modular Genius is Proud Member of These Organizations: